Pingree Road — Union Pacific Northwest Line On-Time Performance
Over the last 30 days, 74.2% of trains stopping at Pingree Road on the Union Pacific Northwest Line were on time (within 5 minutes of the scheduled time), with an average delay of 4.2 min, across 844 observed arrivals.
On-time performance by direction
- Inbound (toward downtown Chicago): 89.3% on time (384 arrivals)
- Outbound (away from downtown): 61.5% on time (460 arrivals)
About this data
Figures cover Metra arrivals at Pingree Road observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.