MetraX · Chicago Metra on-time performance

Harvard — Union Pacific Northwest Line On-Time Performance

Over the last 30 days, 85.7% of trains stopping at Harvard on the Union Pacific Northwest Line were on time (within 5 minutes of the scheduled time), with an average delay of 0.6 min, across 133 observed arrivals.

On-time performance by direction

About this data

Figures cover Metra arrivals at Harvard observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.

See live departures from Harvard →