Harvard — Union Pacific Northwest Line On-Time Performance
Over the last 30 days, 77.6% of trains stopping at Harvard on the Union Pacific Northwest Line were on time (within 5 minutes of the scheduled time), with an average delay of 3.1 min, across 237 observed arrivals.
On-time performance by direction
- Inbound (toward downtown Chicago): 100% on time (128 arrivals)
- Outbound (away from downtown): 51.4% on time (109 arrivals)
About this data
Figures cover Metra arrivals at Harvard observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.