MetraX · Chicago Metra on-time performance

Clybourn — Union Pacific North Line On-Time Performance

Over the last 30 days, 90.2% of trains stopping at Clybourn on the Union Pacific North Line were on time (within 5 minutes of the scheduled time), with an average delay of 2 min, across 348 observed arrivals.

On-time performance by direction

About this data

Figures cover Metra arrivals at Clybourn observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.

See live departures from Clybourn →