MetraX · Chicago Metra on-time performance

Blue Island-Vermont — Rock Island Line On-Time Performance

Over the last 30 days, 80.8% of trains stopping at Blue Island-Vermont on the Rock Island Line were on time (within 5 minutes of the scheduled time), with an average delay of 0.2 min early, across 416 observed arrivals.

On-time performance by direction

About this data

Figures cover Metra arrivals at Blue Island-Vermont observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.

See live departures from Blue Island-Vermont →