75th St. (Grand Crossing) — Metra Electric Line On-Time Performance
Over the last 30 days, 73.4% of trains stopping at 75th St. (Grand Crossing) on the Metra Electric Line were on time (within 5 minutes of the scheduled time), with an average delay of 3.5 min, across 229 observed arrivals.
On-time performance by direction
- Inbound (toward downtown Chicago): 73.5% on time (102 arrivals)
- Outbound (away from downtown): 73.2% on time (127 arrivals)
About this data
Figures cover Metra arrivals at 75th St. (Grand Crossing) observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.