Glen/N. Glenview — Milwaukee District North Line On-Time Performance
Over the last 30 days, 75.8% of trains stopping at Glen/N. Glenview on the Milwaukee District North Line were on time (within 5 minutes of the scheduled time), with an average delay of 3.9 min, across 658 observed arrivals.
On-time performance by direction
- Inbound (toward downtown Chicago): 75.9% on time (328 arrivals)
- Outbound (away from downtown): 75.8% on time (330 arrivals)
About this data
Figures cover Metra arrivals at Glen/N. Glenview observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.