Long Lake — Milwaukee District North Line On-Time Performance
Over the last 30 days, 81.1% of trains stopping at Long Lake on the Milwaukee District North Line were on time (within 5 minutes of the scheduled time), with an average delay of 3.3 min, across 428 observed arrivals.
On-time performance by direction
- Inbound (toward downtown Chicago): 97.8% on time (223 arrivals)
- Outbound (away from downtown): 62.9% on time (205 arrivals)
About this data
Figures cover Metra arrivals at Long Lake observed by MetraX over the last 30 days from the live GTFS-realtime feed. An arrival is on time when it reaches the platform within 5 minutes of the scheduled time.